HA GIANG PHUOC TUONG MECHANICAL., JSC
H.O. & Workshop: No.8 street, Hoa Cam Industrial Zone, Da Nang
Hotline: 0903 283 779 – 0914 113 116
Mail: info@hgpt.vn – Website: https://hgpt.vn/
Currently, HGPT Mechanical is executing the Hoa Phat Dung Quat Phase 2 project. A series of steel structures have been installed at the Hoa Phat Dung Quat Phase 2 site in Quang Ngai.
In every stage, from manufacturing in the factory to transportation and installation, HGPT Mechanical is committed to meticulous attention to detail and ensuring production timelines are met. Additionally, we conduct regular inspections before and after installation to ensure the quality of the project.

HGPT Mechanical installs steel structures at the construction site

HGPT is always committed to quality and project timelines
Thank you to Hoa Phat Dung Quat for trusting and partnering with HGPT!
—
Project Information
Project Name: Hoa Phat Dung Quat Iron and Steel Production Complex Phase 2
Scope: Supply, fabrication, and installation of steel structure packages for the BPRT-NMLG2 fan station area. Fabrication, supply, and installation of steel structures for Lime Plant Phase 2.1 – Sintering Plant 2
Investor: Hoa Phat Dung Quat Steel Joint Stock Company
Location: Binh Son, Quang Ngai
H.O. & Workshop: No.8 street, Hoa Cam Industrial Zone, Da Nang
Hotline: 0903 283 779 – 0914 113 116
Mail: info@hgpt.vn – Website: https://hgpt.vn/